DP23691738 «Effective Modernization of Design and Production of Submersible Pump SMP 13-17/6 for In-Situ Uranium Leaching»
SDG: 12 Responsible Consumption and Production; 15 Life on Land
Amount: grant — 350,000,000.00 KZT; co-financing — 159,250,405.00 KZT
Project Lead: Madina Yesdauletovna Isametova
Grantee: KARLSKRONA LC AB LLP
Location: Shymkent, Tassay microdistrict, 119 block, plot 105
Product: Submersible pump SMP 13-17/6
Current status: Pilot batch
Project goal: Modernization of the SMP 13-17/6 pump design — modification of the impeller with a simplified vane grid system.
Current results: Automated hydrodynamic and strength calculations performed, design documentation for modernized pump developed.
Advantages: Energy efficiency, efficiency improvement.
Efficiency: Ease of maintenance, repairability, ergonomics. Lightweight design, technological accessibility.
Consumers: Pump for uranium leaching, KazAtomProm.
Sales: none