DP23691738 «Effective Modernization of Design and Production of Submersible Pump SMP 13-17/6 for In-Situ Uranium Leaching»

SDG: 12 Responsible Consumption and Production; 15 Life on Land
Amount: grant — 350,000,000.00 KZT; co-financing — 159,250,405.00 KZT
Project Lead: Madina Yesdauletovna Isametova
Grantee: KARLSKRONA LC AB LLP
Location: Shymkent, Tassay microdistrict, 119 block, plot 105
Product: Submersible pump SMP 13-17/6
Current status: Pilot batch

Project goal: Modernization of the SMP 13-17/6 pump design — modification of the impeller with a simplified vane grid system.

Current results: Automated hydrodynamic and strength calculations performed, design documentation for modernized pump developed.

Advantages: Energy efficiency, efficiency improvement.

Efficiency: Ease of maintenance, repairability, ergonomics. Lightweight design, technological accessibility.

Consumers: Pump for uranium leaching, KazAtomProm.

Sales: none

Back to top

An error has occurred!

Try to fill in the fields correctly.

Your data was successfully sent!

We will contact you shortly.

Your data was successfully sent!

A confirmation email was sent to your e-mail address. Please do not forget to confirm your e-mail address.

Translation unavailable


Go to main page